2500 PCS WTS (WAGON TRACKING SYSTEM) CONTRACT SIGNED WITH TCDD
2500 Pcs. Load Wagon Tracking System production and implementation project contract has been signed between ANKARA CELIK and TCDD (Turkish Railways Directorate).
Within the scope of the project, systems shall be mounted on units at Istanbul (Haydarpasa- Sirkeci) , Eskisehir, Ankara, Kayseri, Izmir (Alsancak), Sivas, Malatya, Adana and Afyon.